Porcelain Insulators Made in Liling, Hunan

Hunan Haidian Electrical Porcelain Appliance Co., Ltd. has been producing high- and low-voltage insulators, high-voltage apparatus and matching power equipment since 2018 — all of it at one plant.

Company Profile

We were founded in November 2018 in Liling, Hunan. Liling is where roughly 30% of China's electrical porcelain is made, and our plant covers more than 13,000 m².

The range covers porcelain, glass and composite insulators, metal oxide surge arresters, isolation switches, drop-out fuses and wall bushings. Parts from this plant are in service in China's UHV grid — the 1000 kV AC and ±800 kV DC projects listed below.

Founded
5 November 2018
Plant
13,000 m² and above
Location
Liling, Hunan, China
Product range
15 insulator types, 4 high-voltage products

Reference Projects

China's UHV grid runs at 1000 kV AC and ±800 kV DC — the highest transmission voltages in service anywhere. Parts made in this plant have gone into the projects below.

  • 2020

    Qinghai–Henan ±800 kV UHVDC

    The first UHV corridor built specifically to carry clean energy out of Qinghai; designed for 40 TWh a year.

  • 2020

    Zhumadian–Nanyang, Zhangbei–Xiong'an and West Inner Mongolia–Jinzhong 1000 kV UHVAC

    Part of the North China 1000 kV AC backbone.

  • 2021

    Nanchang–Changsha 1000 kV UHVAC

    The first UHV project started under China's 14th Five-Year Plan; 2 × 341 km, CNY 10.2 billion.

  • 2022

    Baihetan–Jiangsu ±800 kV UHVDC

    Fully commissioned in December 2022; transfer capacity raised to 8 GW.

  • 2024

    Zhangbei–Shengli 1000 kV UHVAC

    732 km, CNY 6.79 billion, more than 70 TWh a year.

  • 2025

    Longdong–Shandong ±800 kV UHVDC

    China's first integrated wind–solar–thermal–storage base export project.

  • 2026

    Shaanxi–Anhui ±800 kV UHVDC

    1,055 km, more than 36 TWh a year.

History

  1. 2018

    Company founded in Liling; insulator production begins at the site we still work from.

  2. 2019

    ISO 9001 quality management certified; the inspection chain from incoming material to finished part is put in place.

  3. 2022

    ISO 14001 and ISO 45001 certified, recognised as a High-tech Enterprise, and granted the national grid access certificate.

Production and Testing

Insulators fail for boring reasons — a bad batch of clay, a kiln that drifted, a cracked shed nobody looked at. The process is arranged to catch those early.

  • 01

    Incoming Material Is Checked, Not Trusted

    Clay bodies, glazes and metal fittings are measured when they arrive. Finished pieces are inspected one by one before packing, not by sampling a box.

  • 02

    Process Parameters Run Under Automated Control

    Kiln curves and process settings are computer-controlled and monitored, which keeps a batch consistent and takes the result out of individual hands.

  • 03

    One Inspection Chain, Start to Finish

    Incoming inspection, in-process checks and final appearance inspection sit in a single line, so a deviation is caught where it happens instead of at the end.

Certifications

Scans of the original certificates are sent with a quotation, or on request.

Find Us

6 Lisan Road, Yangsanshi Subdistrict
Liling, Zhuzhou, Hunan, China

+86 731 2328 2798

By road
The G60 Shanghai–Kunming expressway passes through Liling.
By rail
Liling station on the Shanghai–Kunming high-speed line; Zhuzhou West on the Beijing–Guangzhou line is half an hour away.
By air
Under an hour from Changsha Huanghua International Airport.

Need Specifications or a Sample?

Tell us the voltage class, type and quantity — we reply within one working day.

We usually reply within one working day.